Working the ground among the young avocado trees

What we are
building above Ilat.

Twenty-five hectares held on long lease, nineteen of them planted, forty thousand trees in the ground since August 2025 — and the water, power and roads built alongside them rather than after.

Get in touch →
The land today

The land, today.

Ground that had never been farmed has been cleared, terraced where the slope required it, irrigated and planted. Roads run through it. Water, power and storage were built alongside the trees rather than after them.

Land held
25+ hectares
29+ potential
Cleared and planted
19 hectares
Trees planted
40,000+
Planting density
~2,200
per hectare
Target
60,000+
trees by 2028
Land taken on
June 2025
First planting
August 2025
First harvest
Expected 2028
The phases

Built in stages,
on the land’s terms.

2025
The ground.

Land taken on in June. Clearing, access roads, the spring tapped and the pump installed, and the full solar array - more than 350 panels - built. First planting from August.

2026
The build.

Planting on to 40,000 trees across nineteen hectares. The road network extended through the blocks. Offices, storage and staff accommodation built. Sprinklers added on 5,000 trees. The first fruit appears on the earliest trees.

2027
The water.

A second source drilled, storage increased, the array extended beyond 500 panels with a second pump. Planting continues toward 60,000 trees.

2028
The harvest.

First commercial crop expected. Certification in place for the markets we are targeting.

The land

What comes next

The holding will be extended toward 29 hectares, taking the orchard past 60,000 trees. The water and power to serve it are already being built.
A share of any harvest cannot be sold fresh - fruit that falls, fruit marked on one side, fruit knocked in handling. We are developing two routes that give it a destination: cold-pressed oil, and freezing. Both are in development ahead of the first harvest.

Three workers tending young avocado trees on the hillside
Who is behind it

Farms are usually
built by farmers.

This one was built by a group that spends its working life moving earth, laying pipe and putting up buildings in difficult places — AG Vision Group, across Nigeria, South Sudan and Lebanon, in construction, mineral exploration, heavy equipment engineering and trading.

The orchard is our first agricultural venture, and it was built the way we build everything else.